Latest News
20
STEP 1: Purchase minimum 1/2" x 1" square metal tubing. Cut dado into subtop material.
STEP 2: Test fit tubing allowing about a 1/16" on each side of the tube and make it flush with the top of the subtop.
STEP 3: Fit metal tubing and cut to length.
STEP 4: Paint tubing with a Rustoleum paint to eliminate the spread of rust. Be sure to thoroughly clean the metal prior to painting.
STEP 5: Use construction adhesive to adhere the tubing within the dado. Make sure to push out excess adhesive so the tube lays flat with the subtop material. Let adhesive cure completely before installation.
 This process works extemely well for solid surface, quartz and granite. Be sure to cut ventilation holes in material for venting if using with solid surface which is a required fabrication rule.  

 

Posted in: All, Industry News
Actions: E-mail | Permalink |